- Preparation of equipment layout drawings Plan and Elevation
- Preparation of mechanical data sheets for all fabricated equipment such as vessels and heat exchangers
- Preparation of GA drawing for all fabricated equipment
- Preparation of specification sheet for bought out items like pumps, valves, blowers, conveyors
- Verification and approval of vendor’s fabrication drawings for fabricated equipment
- Verification and approval of vendors documents/ drawings and package units
- Preparation of specification and schedule for mechanical erection of equipment for tender purposes
Scroll to top